Work–span model and Brent's theorem
StructureComputation DAG#✓fully proved
A computation DAG on \(n\) unit-time tasks, numbered \(0, \dots, n - 1\), assigns to each task \(v\) a list of predecessors (the tasks \(v\) waits for), each numbered below \(v\); so the numbering is a topological order.
structure Dag (n : ℕ) where
/-- The tasks each task waits for. -/
preds : Fin n → List (Fin n)
/-- Predecessors come first. -/
topo : ∀ v, ∀ u ∈ preds v, u < v
preds : Fin n → List (Fin n)
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:58
Used by 35
DefinitionDepth of a task in a computation DAG#✓fully proved
The depth of a task \(v\) is the number of tasks on a longest path ending at \(v\): it is \(1\) plus the largest depth of a predecessor of \(v\), or \(1\) if \(v\) has no predecessors.
def depth (v : Fin n) : ℕ :=
1 + ((G.preds v).attach.map fun u => depth u.1).foldr max 0
termination_by v.val
decreasing_by exact G.topo v u.1 u.2
Uses 1 · Used by 15
DefinitionSpan of a computation DAG#✓fully proved
The span of a computation DAG is the number of tasks on a longest path, that is, the largest depth of a task, and \(0\) when there are no tasks.
def span : ℕ := Finset.univ.sup (depth G)
def depth (v : Fin n) : ℕ :=
1 + ((G.preds v).attach.map fun u => depth u.1).foldr max 0
termination_by v.val
decreasing_by exact G.topo v u.1 u.2
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:65
TheoremPredecessors have smaller depth#✓fully proved
In a computation DAG, if \(u\) is a predecessor of \(v\), then the depth of \(u\) is strictly less than the depth of \(v\).
theorem depth_lt_of_mem {u v : Fin n} (hu : u ∈ G.preds v) : depth G u < depth G v
def depth (v : Fin n) : ℕ :=
1 + ((G.preds v).attach.map fun u => depth u.1).foldr max 0
termination_by v.val
decreasing_by exact G.topo v u.1 u.2
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:65
Uses 2 · Used by 2
DefinitionDepths of an initial segment of tasks#✓fully proved
For \(k \le n\), the list of the depths of tasks \(0, \dots, k - 1\) of a computation DAG on \(n\) tasks, computed in topological order: the empty list for \(k = 0\), and for \(k + 1\) the list for \(k\) followed by \(1\) plus the largest entry of that list at a predecessor of task \(k\) (or \(1\) if task \(k\) has no predecessors).
def depthsUpTo : (k : ℕ) → k ≤ n → List ℕ
| 0, _ => []
| k + 1, h =>
let acc := depthsUpTo k (Nat.le_of_succ_le h)
acc ++ [1 + ((G.preds ⟨k, h⟩).map fun u => acc.getD u.val 0).foldr max 0]
Uses 1 · Used by 2
DefinitionTable of depths#✓fully proved
The list of the depths of tasks \(0, \dots, n - 1\) of a computation DAG on \(n\) tasks, computed once each in topological order: the entry for task \(k\) is \(1\) plus the largest entry at a predecessor of \(k\), or \(1\) if \(k\) has no predecessors.
With lists (appending and indexed reads take linear time) this costs \(O(n^2 + n|E|)\), where \(|E|\) is the total number of predecessor entries; evaluating the depth directly from its recursive definition instead recomputes shared subpaths exponentially often.
def depthTable : List ℕ := depthsUpTo G n (Nat.le_refl n)
def depthsUpTo : (k : ℕ) → k ≤ n → List ℕ
| 0, _ => []
| k + 1, h =>
let acc := depthsUpTo k (Nat.le_of_succ_le h)
acc ++ [1 + ((G.preds ⟨k, h⟩).map fun u => acc.getD u.val 0).foldr max 0]
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:100
Uses 2 · Used by 1
TheoremThe table of depths is correct#✓fully proved
For every task \(v\) of a computation DAG, the entry of the table of depths at position \(v\) equals the depth of \(v\).
theorem getD_depthTable (v : Fin n) : (depthTable G).getD v.val 0 = depth G v
def depthTable : List ℕ := depthsUpTo G n (Nat.le_refl n)
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:109
def depth (v : Fin n) : ℕ :=
1 + ((G.preds v).attach.map fun u => depth u.1).foldr max 0
termination_by v.val
decreasing_by exact G.topo v u.1 u.2
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:65
Uses 4
StructureSchedule of a computation DAG#✓fully proved
A schedule of a computation DAG on \(n\) tasks on \(p\) processors assigns to each task \(v\) a step \(t(v) \in \mathbb{N}\) in which it runs, such that \(t(u) < t(v)\) whenever \(u\) is a predecessor of \(v\), and for every step \(s\) at most \(p\) tasks \(v\) have \(t(v) = s\).
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
time : Fin n → ℕ
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:143
Uses 1 · Used by 20
DefinitionLength of a schedule#✓fully proved
The length of a schedule is the number of steps it takes: one more than the latest step in which a task runs (steps are numbered from \(0\)), or \(0\) if there are no tasks.
def Schedule.length {p : ℕ} (S : Schedule G p) : ℕ := Finset.univ.sup fun v => S.time v + 1
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
Uses 2 · Used by 12
TheoremThe work law#✓fully proved
For a computation DAG on \(n\) tasks, every schedule of it on \(p\) processors that takes \(T\) steps satisfies \(n \le p T\). In particular, for \(p > 0\) the schedule takes at least \(n / p\) steps.
theorem Schedule.work_le {p : ℕ} (S : Schedule G p) : n ≤ p * S.length
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
Uses 3 · Used by 1
TheoremDepth bounds the step of a task#✓fully proved
For every schedule of a computation DAG on \(p\) processors, with steps numbered from \(0\), every task \(v\) runs in a step \(t\) with \(\operatorname{depth}(v) \le t + 1\).
theorem Schedule.depth_le_time {p : ℕ} (S : Schedule G p) (v : Fin n) :
depth G v ≤ S.time v + 1
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
def depth (v : Fin n) : ℕ :=
1 + ((G.preds v).attach.map fun u => depth u.1).foldr max 0
termination_by v.val
decreasing_by exact G.topo v u.1 u.2
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:65
Uses 3 · Used by 1
TheoremThe span law#✓fully proved
No schedule is shorter than the span.
theorem Schedule.span_le {p : ℕ} (S : Schedule G p) : span G ≤ S.length
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
def span : ℕ := Finset.univ.sup (depth G)
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:71
Uses 6 · Used by 1
DefinitionLevel size#✓fully proved
For a computation DAG and a natural number \(d\), the size of level \(d\) is the number of tasks of depth \(d\).
def levelCard (d : ℕ) : ℕ := (Finset.univ.filter fun v => depth G v = d).card
def depth (v : Fin n) : ℕ :=
1 + ((G.preds v).attach.map fun u => depth u.1).foldr max 0
termination_by v.val
decreasing_by exact G.topo v u.1 u.2
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:65
Uses 2 · Used by 5
DefinitionSteps of a level#✓fully proved
For a computation DAG and natural numbers \(p\) and \(d\), let \(L_d\) be the number of tasks of depth \(d\). The number of steps of level \(d\) on \(p\) processors is \(\lceil L_d / p \rceil\) if \(p \ge 1\), and \(0\) if \(p = 0\).
def levelSteps (p d : ℕ) : ℕ := (levelCard G d + p - 1) / p
def levelCard (d : ℕ) : ℕ := (Finset.univ.filter fun v => depth G v = d).card
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:191
Uses 2 · Used by 4
DefinitionFirst step of a level#✓fully proved
For a computation DAG and natural numbers \(p\) and \(d\), let \(s_e\) be the number of steps of level \(e\) on \(p\) processors: \(\lceil L_e / p \rceil\) if \(p \ge 1\) and \(0\) if \(p = 0\), where \(L_e\) is the number of tasks of depth \(e\). The first step of level \(d\) is \(\sum_{e < d} s_e\).
def offset (p d : ℕ) : ℕ := ∑ e ∈ Finset.range d, levelSteps G p e
def levelSteps (p d : ℕ) : ℕ := (levelCard G d + p - 1) / p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:194
Uses 2 · Used by 4
DefinitionRank within a level#✓fully proved
In a computation DAG, the rank of a task \(v\) is the number of tasks of the same depth as \(v\) with a smaller number than \(v\). Taken in numbering order, the tasks of a level have ranks \(0, 1, 2, \dots\)
def rank (v : Fin n) : ℕ := (Finset.univ.filter fun u => depth G u = depth G v ∧ u < v).card
def depth (v : Fin n) : ℕ :=
1 + ((G.preds v).attach.map fun u => depth u.1).foldr max 0
termination_by v.val
decreasing_by exact G.topo v u.1 u.2
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:65
Uses 2 · Used by 5
DefinitionStep of a task in Brent's schedule#✓fully proved
Let \(G\) be a computation DAG and \(p\) a natural number. If \(p \ge 1\), for each \(d\) let \(L_d\) be the number of tasks of depth \(d\) and \(o_d = \sum_{e < d} \lceil L_e / p \rceil\), and for each task \(v\) let \(r(v)\) be the number of tasks of the same depth as \(v\) with a smaller number; the step of a task \(v\) is \(o_{\operatorname{depth}(v)} + \lfloor r(v) / p \rfloor\). If \(p = 0\), the step of every task is \(0\).
For \(p \ge 1\) this runs the tasks level by level, each level of \(L_d\) tasks in \(\lceil L_d / p \rceil\) steps of at most \(p\) tasks.
def levelTime (p : ℕ) (v : Fin n) : ℕ := offset G p (depth G v) + rank G v / p
def offset (p d : ℕ) : ℕ := ∑ e ∈ Finset.range d, levelSteps G p e
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:197
def depth (v : Fin n) : ℕ :=
1 + ((G.preds v).attach.map fun u => depth u.1).foldr max 0
termination_by v.val
decreasing_by exact G.topo v u.1 u.2
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:65
def rank (v : Fin n) : ℕ := (Finset.univ.filter fun u => depth G u = depth G v ∧ u < v).card
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:200
Uses 4 · Used by 3
TheoremNo step of Brent's level schedule mixes levels#✓fully proved
Let \(G\) be a computation DAG and \(p \ge 1\). If two tasks \(u\) and \(v\) run in the same step of Brent's level-by-level schedule on \(p\) processors, then \(u\) and \(v\) have the same depth.
theorem depth_eq_of_levelTime_eq {p : ℕ} (hp : 1 ≤ p) {u v : Fin n}
(h : levelTime G p u = levelTime G p v) : depth G u = depth G v
def levelTime (p : ℕ) (v : Fin n) : ℕ := offset G p (depth G v) + rank G v / p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:203
def depth (v : Fin n) : ℕ :=
1 + ((G.preds v).attach.map fun u => depth u.1).foldr max 0
termination_by v.val
decreasing_by exact G.topo v u.1 u.2
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:65
Uses 7 · Used by 1
TheoremRanks increase within a level#✓fully proved
In a computation DAG, if tasks \(u\) and \(v\) have the same depth and \(u\) has a smaller number than \(v\), then the rank of \(u\) is smaller than the rank of \(v\), where the rank of a task is the number of tasks of the same depth with a smaller number. In particular, ranks are distinct within a level.
theorem rank_lt_rank {u v : Fin n} (hd : depth G u = depth G v) (h : u < v) :
rank G u < rank G v
def depth (v : Fin n) : ℕ :=
1 + ((G.preds v).attach.map fun u => depth u.1).foldr max 0
termination_by v.val
decreasing_by exact G.topo v u.1 u.2
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:65
def rank (v : Fin n) : ℕ := (Finset.univ.filter fun u => depth G u = depth G v ∧ u < v).card
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:200
Uses 3 · Used by 1
DefinitionBrent's level schedule#✓fully proved
Let \(G\) be a computation DAG and \(p \ge 1\). For each \(d\) let \(L_d\) be the number of tasks of depth \(d\) and \(o_d = \sum_{e < d} \lceil L_e / p \rceil\), and for each task \(v\) let \(r(v)\) be the number of tasks of the same depth as \(v\) with a smaller number. Brent's level schedule is the schedule of \(G\) on \(p\) processors that runs each task \(v\) at step \(o_{\operatorname{depth}(v)} + \lfloor r(v) / p \rfloor\).
It runs the tasks level by level, in order of depth, each level of \(L_d\) tasks in \(\lceil L_d / p \rceil\) steps of at most \(p\) tasks.
Cslib.Algorithms.Lean.Parallel.Brent.levelSchedule · 41 lines
def levelSchedule {p : ℕ} (hp : 1 ≤ p) : Schedule G p where
time := levelTime G p
prec v u hu := by
have hlt := depth_lt_of_mem G hu
have h1 := levelTime_lt G hp u
have h2 := offset_add_le G (p := p) hlt
have h3 : offset G p (depth G v) ≤ levelTime G p v := Nat.le_add_right _ _
omega
cap t := by
by_cases hne : (Finset.univ.filter fun v => levelTime G p v = t).Nonempty
· obtain ⟨w, hw⟩ := hne
have hwt : levelTime G p w = t := (Finset.mem_filter.1 hw).2
set j := rank G w / p
-- every task in step `t` has rank in `[j p, j p + p)`
have hmaps : ∀ v ∈ Finset.univ.filter (fun v => levelTime G p v = t),
rank G v ∈ Finset.Ico (j * p) (j * p + p) := fun v hv => by
have hvt : levelTime G p v = t := (Finset.mem_filter.1 hv).2
have hd := depth_eq_of_levelTime_eq G hp (hvt.trans hwt.symm)
have hj : rank G v / p = j := by
have := hvt.trans hwt.symm
unfold levelTime at this
rw [hd] at this
omega
rw [Finset.mem_Ico]
constructor
· rw [← hj]; exact Nat.div_mul_le_self _ _
· rw [← hj]
have := Nat.lt_div_mul_add (a := rank G v) (show 0 < p by omega)
omega
have hinj : Set.InjOn (rank G) (Finset.univ.filter fun v => levelTime G p v = t) :=
fun u hu v hv huv => by
have hd := depth_eq_of_levelTime_eq G hp
((Finset.mem_filter.1 hu).2.trans (Finset.mem_filter.1 hv).2.symm)
by_contra hne
rcases lt_or_gt_of_ne hne with h | h
· exact absurd huv (Nat.ne_of_lt (rank_lt_rank G hd h))
· exact absurd huv (Nat.ne_of_gt (rank_lt_rank G hd.symm h))
have := Finset.card_le_card_of_injOn (rank G) hmaps hinj
rwa [Nat.card_Ico, Nat.add_sub_cancel_left] at this
· rw [Finset.not_nonempty_iff_eq_empty.1 hne, Finset.card_empty]
exact Nat.zero_le _
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
def levelTime (p : ℕ) (v : Fin n) : ℕ := offset G p (depth G v) + rank G v / p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:203
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:145
Uses 11 · Used by 2
TheoremLevel \(0\) is empty#✓fully proved
In every computation DAG no task has depth \(0\), so the number of tasks of depth \(0\) is \(0\).
theorem levelCard_zero : levelCard G 0 = 0
def levelCard (d : ℕ) : ℕ := (Finset.univ.filter fun v => depth G v = d).card
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:191
Uses 3 · Used by 1
TheoremBrent's theorem#✓fully proved
Let \(G\) be a computation DAG with \(n\) tasks and span \(D\), and let \(p \ge 1\). If Brent's level schedule of \(G\) on \(p\) processors takes \(T\) steps, then \(pT \le n + (p - 1) D\), that is, \(T \le (n - D)/p + D\).
theorem levelSchedule_length {p : ℕ} (hp : 1 ≤ p) :
p * (levelSchedule G hp).length ≤ n + (p - 1) * span G
def levelSchedule {p : ℕ} (hp : 1 ≤ p) : Schedule G p where
time := levelTime G p
prec v u hu := by
have hlt := depth_lt_of_mem G hu
have h1 := levelTime_lt G hp u
have h2 := offset_add_le G (p := p) hlt
have h3 : offset G p (depth G v) ≤ levelTime G p v := Nat.le_add_right _ _
omega
cap t := by
by_cases hne : (Finset.univ.filter fun v => levelTime G p v = t).Nonempty
· obtain ⟨w, hw⟩ := hne
have hwt : levelTime G p w = t := (Finset.mem_filter.1 hw).2
⋯
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:260
def span : ℕ := Finset.univ.sup (depth G)
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:71
Uses 12 · Used by 1
TheoremBrent's theorem with the work and span laws#✓fully proved
Let \(G\) be a computation DAG on \(n\) unit-time tasks with span \(D\), and let \(p \ge 1\). Then some schedule of \(G\) on \(p\) processors has length \(T\) with \(pT \le n + (p - 1)D\), and every schedule of \(G\) on \(p\) processors has a length \(T'\) with \(n \le pT'\) (the work law) and \(D \le T'\) (the span law).
theorem brent {p : ℕ} (hp : 1 ≤ p) :
∃ S : Schedule G p, p * S.length ≤ n + (p - 1) * span G ∧
∀ S' : Schedule G p, n ≤ p * S'.length ∧ span G ≤ S'.length
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
def span : ℕ := Finset.univ.sup (depth G)
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:71
Uses 8
DefinitionLoad of a step#✓fully proved
The load of step \(t\) in a schedule \(S\) of a computation DAG is the number of tasks that \(S\) runs in step \(t\).
def Schedule.load (S : Schedule G p) (t : ℕ) : ℕ := (Finset.univ.filter fun v => S.time v = t).card
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
Uses 2 · Used by 9
DefinitionReady task#✓fully proved
In a schedule \(S\) of a task graph, a task \(v\) is ready at step \(t\) if \(v\) runs in a step later than \(t\) and every predecessor of \(v\) runs in a step earlier than \(t\).
def Schedule.Ready (S : Schedule G p) (t : ℕ) (v : Fin n) : Prop :=
t < S.time v ∧ ∀ u ∈ G.preds v, S.time u < t
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
Uses 2 · Used by 4
DefinitionGreedy schedule#✓fully proved
A schedule \(S\) of a computation DAG on \(p\) processors is greedy if, for every step \(t\) and every task that is ready at step \(t\), exactly \(p\) tasks run in step \(t\): a step leaves a ready task waiting only when all \(p\) processors are busy.
def Schedule.Greedy (S : Schedule G p) : Prop := ∀ t v, S.Ready t v → S.load t = p
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
Uses 4 · Used by 6
TheoremGreediness need only be checked at the steps of the schedule#✓fully proved
Let \(S\) be a schedule of a computation DAG on \(p\) processors taking \(T\) steps. Then \(S\) is greedy if and only if, for every step \(t < T\) and every task \(v\) that is ready at step \(t\), exactly \(p\) tasks run in step \(t\).
This holds because a task is never ready at or after the last step.
theorem Schedule.greedy_iff (S : Schedule G p) :
S.Greedy ↔ ∀ t < S.length, ∀ v, S.Ready t v → S.load t = p
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
Uses 6
DefinitionNumber of incomplete steps#✓fully proved
For a schedule \(S\) of a computation DAG on \(p\) processors and a natural number \(t\), the number of incomplete steps before step \(t\) is the number of steps \(s < t\) in which \(S\) runs fewer than \(p\) tasks.
def Schedule.incomplete (S : Schedule G p) (t : ℕ) : ℕ :=
((Finset.range t).filter fun s => S.load s < p).card
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
Uses 3 · Used by 2
TheoremEach incomplete step advances the critical path#✓fully proved
In a greedy schedule, fewer than
depth v incomplete steps precede the step of task v.
theorem Schedule.incomplete_lt_depth (S : Schedule G p) (hS : S.Greedy) :
∀ (t : ℕ) (v : Fin n), S.time v = t → S.incomplete t < depth G v
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
def depth (v : Fin n) : ℕ :=
1 + ((G.preds v).attach.map fun u => depth u.1).foldr max 0
termination_by v.val
decreasing_by exact G.topo v u.1 u.2
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:65
Uses 8 · Used by 1
TheoremThe step loads add up to the number of tasks#✓fully proved
For a schedule \(S\) of a task graph with \(n\) tasks that takes \(T\) steps, the numbers of tasks run in the steps \(0, 1, \dots, T - 1\) add up to \(n\).
theorem Schedule.sum_load (S : Schedule G p) :
∑ t ∈ Finset.range S.length, S.load t = n
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
Uses 4 · Used by 2
TheoremComplete steps are bounded by the work#✓fully proved
Let \(G\) be a computation DAG with \(n\) tasks, and let \(S\) be a schedule of \(G\) on \(p\) processors taking \(T\) steps. If \(C\) is the number of steps \(t < T\) in which \(S\) runs at least \(p\) tasks (the complete steps, where all \(p\) processors are busy), then \(pC \le n\).
theorem Schedule.mul_complete_le (S : Schedule G p) :
p * ((Finset.range S.length).filter fun s => ¬ S.load s < p).card ≤ n
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
Uses 5
TheoremA greedy schedule has at most \(D\) incomplete steps#✓fully proved
Let \(G\) be a computation DAG with span \(D\), and let \(S\) be a greedy schedule of \(G\) on \(p\) processors taking \(T\) steps. Then at most \(D\) of the steps \(t < T\) are incomplete, that is, run fewer than \(p\) tasks.
theorem Schedule.incomplete_length_le (S : Schedule G p) (hS : S.Greedy) :
S.incomplete S.length ≤ span G
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
def span : ℕ := Finset.univ.sup (depth G)
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:71
Uses 9 · Used by 1
TheoremEvery step of a schedule has a task running at or after it#✓fully proved
Let \(S\) be a schedule of a computation DAG on \(p\) processors taking \(T\) steps, numbered from \(0\). For every step \(t < T\) there is a task that \(S\) runs at step \(t\) or later.
theorem Schedule.exists_le_time (S : Schedule G p) {t : ℕ} (ht : t < S.length) :
∃ v, t ≤ S.time v
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
Uses 3 · Used by 1
TheoremA greedy schedule never idles#✓fully proved
Let \(S\) be a greedy schedule of a task graph on \(p\) processors that takes \(T\) steps, numbered \(0, \dots, T - 1\). Then every step \(t < T\) of \(S\) runs at least one task.
The task that runs earliest among those not run before step \(t\) has all its predecessors done before step \(t\). If step \(t\) ran no task, this task would be ready at step \(t\), while a greedy step with a ready task keeps all \(p\) processors busy.
theorem Schedule.one_le_load (S : Schedule G p) (hS : S.Greedy) {t : ℕ} (ht : t < S.length) :
1 ≤ S.load t
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
Uses 7 · Used by 1
TheoremThe greedy scheduling bound#✓fully proved
Let \(G\) be a computation DAG with \(n\) tasks and span \(D\), and let \(S\) be a greedy schedule of \(G\) on \(p\) processors taking \(T\) steps. Then \(pT \le n + (p - 1)D\).
Each complete step runs \(p\) tasks, and each of the at most \(D\) incomplete steps runs at least one.
theorem Schedule.greedy_length_le (S : Schedule G p) (hS : S.Greedy) :
p * S.length ≤ n + (p - 1) * span G
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
def span : ℕ := Finset.univ.sup (depth G)
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:71
Sources
- the unit-task case of Graham's list-scheduling argument, Graham, Bounds for certain multiprocessing anomalies, Bell System Tech. J. 45, 1966.
Uses 9 · Used by 1
TheoremThe work-span bound for greedy schedules#✓fully proved
Let \(G\) be a computation DAG with \(n\) tasks and span \(D\), and let \(S\) be a greedy schedule of \(G\) on \(p\) processors taking \(T\) steps. Then \(pT \le n + pD\), that is, \(T \le n/p + D\) when \(p \ge 1\).
This is a weakening of the greedy scheduling bound \(pT \le n + (p - 1)D\).
theorem Schedule.greedy_length (S : Schedule G p) (hS : S.Greedy) :
p * S.length ≤ n + p * span G
structure Schedule (p : ℕ) where
/-- The step in which each task runs. -/
time : Fin n → ℕ
/-- Predecessors run earlier. -/
prec : ∀ v, ∀ u ∈ G.preds v, time u < time v
/-- At most `p` tasks per step. -/
cap : ∀ t, (Finset.univ.filter fun v => time v = t).card ≤ p
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:141
def span : ℕ := Finset.univ.sup (depth G)
CSLibExt/Algorithms/Lean/Parallel/Brent.lean:71
Sources
- CLRS, third edition, Theorem 27.1.